Projects     Small hydroelectric projects

 

We are able to erect turn-key projects for so called „waste gasification plants", means we are using Municipality waste (mixed waste) to produce „syn-gas" which will be used to produce electric power and heat.

This absolute modern European technology, containerized and flexible and can also be used to reduce overloaded land-fill capacities to a minimum.

The erection can also be done very close or directly to land-fill areas.

Minimum need for best efficiency is 100.000 tons of waste per year

 

Small  hydroelectrical projects