Arethusa

Project Status

Competition

Date

2008

Address

Halkida

PARTICIPATION IN THE SECOND STAGE OF THE COMPETITION FOR THE CONVERSION OF THE EXISTING BUILDING INTO A MUSEUM AND THE CONSTRACTION OF A NEW BUILDING FOR WORKSHOPS.

Participation in the second stage of the competition after the selection.
The study on the restructuring of the existing building into a museum and the creation of a new building workshops ..
The fairgrounds are developed in a way that they are all successively visited without visitors having to go through non-controlled area (entrance hall assembly halls etc.).
Due to the elevation of the floor at 0.65 m in the tank allow for a transparent part of the floor space, which allows the viewing of the bottom two or three tanks and openings basin water leaching
The touch of the old with the new BUILDINGS ensured by the two lanes on each side of prosktimatos and is constructed of structural krystallo.
The uniform surface in front of the new building, creating an appropriate background for the emergence of the old building. Simultaneously the formation of non-right angles, the use of metal in the coating of the facade and the curvature of the coronation of the new building serving the aesthetic differentiation from the old.

Photographs

View it on map