Monastery

Project Status

Study/Construction

Date

1999

Address

Agio Oros

SUDY FOR THE RESTORATION OF THE NE KODRA MONASTERY STAVRONIKITA

 

The study includes a comprehensive mapping of existing buildings, over 1,000 years, analysis of historical phases and proposed interventions in the final design level of implementation. This study was first to solve the problems found in the documentation, both building and static, the other functional use of space with rearrangement in existing buildings. At the same time was very important work of restoration with respect to age of buildings using traditional materials and construction methods. The total project budget amounted to 1,467,351.00 euros. The study was submitted and approved by the KEDAK.